Engineering practice
How I measure, verify, and report technical work: metrics, thresholds, status reviews, and the evidence behind them.
Why P2 work rarely gets done, and how I pick three goals a day
I score tasks 1 to 5 on importance and urgency, map them to P0, P1, P2, or drop, and set three goals a day. A priority-queue model shows why P2 work waits.
Why AI-generated code can wait weeks for review, and what shortens the wait
An agent can write a few thousand lines in an hour, and review of the split-up changes can take two weeks. A queueing model estimates where that time goes and which review practices shorten it.
Does writing with AI weaken your thinking? What the studies show
Experiments from 2023 to 2026 show when AI help lowers what writers learn and remember. The evidence supports drafting an important argument yourself, then using AI as a critic.
Reporting a complex engineering program with a few KPIs and a stoplight chart
Three to five measures with red, yellow, and green thresholds can tell leadership a program is drifting. Choosing the measures and thresholds is technical work.
Prototyping research code in a notebook, then rewriting it as a tested package
My 2024 phased-array notebook became a tested Python package in 2026. The rewrite fixed one dB error and kept another, which a unit test had encoded.