Why P2 work rarely gets done, and how I pick three goals a day
I have more worthwhile work than hours, at my job and at home. For years I have managed that with a small system. I rate each task from 1 to 5 on importance and on urgency, map the pair to a priority level from P0 to P2 or drop the task, and each morning pick three goals for the day, each traced to a quarterly goal and an annual goal. The system rests on what I think of as an open secret. When there is more work than hours, work filed in the lowest tier I keep, which I call P2, rarely gets done.
This post describes the system and checks each part against published evidence: the 5 × 5 table (Figure 1, with an interactive version), a priority-queue model and bug-tracker data on why the lowest tier waits (Figure 2), and the three-goal rule with its goal hierarchy (Figure 3). Goal setting rests on strong evidence and urgency bias on laboratory experiments that have replicated, while the number three rests on my own experience. I say which is which as I go.
Importance and urgency measure different things
Dwight Eisenhower drew the distinction in an August 1954 speech to the World Council of Churches, quoting an unnamed “former college president”: “I have two kinds of problems, the urgent and the important. The urgent are not important, and the important are never urgent” (Eisenhower, 1954). Stephen Covey’s The 7 Habits of Highly Effective People (1989) popularized the four-quadrant drawing as a “Time Management Matrix” with Quadrants I through IV (FranklinCovey). The matrix came to carry Eisenhower’s name afterward, and I found no record that he drew one.
A value curve makes the two axes concrete. Let V(t) be the value of finishing a task at time t. Importance is the height of the curve and urgency is how soon it falls, and the cost of delaying the task from t to t + Δt, V(t) − V(t + Δt), depends on both. Donald Reinertsen’s The Principles of Product Development Flow (2009) states the working rule as its principle E3: “If you only quantify one thing, quantify the cost of delay.” Panel (a) of Figure 2, below, sketches one curve per quadrant. The Quadrant II curve stays high and nearly flat, then falls at a deadline nobody scheduled, which is how deferred maintenance or a skipped checkup turns into an emergency.
People weigh urgency more than its cost justifies. In five experiments, Zhu, Yang, and Hsee found that participants chose tasks with objectively lower payoffs over tasks with higher payoffs when the lower-payoff tasks only appeared to expire sooner, a violation of dominance they named the mere urgency effect (Zhu et al., 2018). An independent replication with 2,374 participants found the effect smaller once confounds were controlled and still significant, “at least within the paradigm studied” (Mills, Cubitt, and Starmer, 2026). Laboratory choices between small tasks say little about the size of the effect across a workday, so I take these results as a reason to score importance explicitly before urgency gets a vote, although no experiment has tested the table itself.
Scoring importance and urgency from 1 to 5
A two-by-two matrix forces every task into one of four boxes, and most of my tasks sit near a boundary. I rate each task from 1 to 5 on both axes, using the anchors in Table 1. Importance is defined by my goal hierarchy, so a score of 4 means the task directly advances a quarterly goal. Urgency is defined by how fast the cost of waiting grows.
Table 1. Anchors for the two scores.
| Score | Importance: what it does for my goals | Urgency: how fast waiting gets costly |
|---|---|---|
| 5 | Directly advances an annual goal, or prevents serious harm to health, family, or a commitment others depend on | Cost rises within hours; start today |
| 4 | Directly advances a quarterly goal | Cost rises within days; this week |
| 3 | Supports a goal indirectly, or meets an obligation with moderate consequences | Cost rises within weeks |
| 2 | Small benefit; no goal moves | Waiting a month costs little |
| 1 | No effect on any goal | Waiting a quarter costs nothing |
The table maps the 25 score pairs to four levels, with importance taking precedence (Figure 1). P0 requires importance of at least 4 and urgency 5. Every other task with importance of 4 or more is P1, and so is importance 3 with urgency of 4 or more. The rest of the importance-3 row is P2, and so is low-importance work with urgency of 4 or 5. The remaining 6 cells are dropped, which gives 2 P0 cells, 10 P1, 7 P2, and 6 drop, and no amount of urgency lifts a task of importance 1 or 2 above P2.

Figure 1. The lookup from importance and urgency scores to P0, P1, P2, or drop. Of the 25 cells, 2 are P0, 10 are P1, 7 are P2, and 6 are drop. Dashed lines between scores 3 and 4 and the roman numerals mark Covey’s quadrants. Urgency increases to the right, so Quadrant I sits at top right. The arrow shows the drift explained in Figure 2(a), in which deferred P1 work gains urgency until it lands in a P0 cell.
I rejected the product score that engineering risk matrices use for likelihood and consequence. Multiplying the two scores would rank a very important task with no deadline (5 × 1 = 5) below an unimportant urgent one (2 × 5 = 10). Under a strict cost-of-delay rule that order can be right for a day, because the important task loses little by waiting. Urgency is also the score the mere urgency effect inflates, and a Quadrant II task can jump from urgency 1 to 5 at a deadline nobody scheduled, so I let importance set the level.
The level names come from engineering bug trackers, and my levels sit lower than theirs. Google’s public Issue Tracker defines P0 as “An issue that needs to be addressed immediately and with as many resources as is required,” describes P2 as work to address “on a reasonable timescale” and as “the default priority level,” and assigns P3 and P4 to work addressed “when able” and “eventually” (Google Issue Tracker). My P2 is the lowest level I keep, so it corresponds to Google’s P3 and P4.
The classifier below applies the same table and shows, for any pair of scores, the level and what I do with work at that level.
Priority classifier
P1
Importance 5, urgency 2: P1 (schedule). Give it a slot in one of the next few days' three goals, or do it around today's three if it cannot wait.
The table is my own heuristic, described in the post. The classifier runs in your browser, and your choices stay on your device.
prioritykit, an open-source Python package I wrote
alongside this post, applies the same rules from the command line and through a Model Context
Protocol (MCP) server that AI agents can call. pip install "prioritykit[mcp]" installs both from
the Python Package Index (PyPI).
A P0 task replaces part of the day’s plan, so I rewrite the day’s three goals around it and name the goal it displaces. Interruptions cost more than the minutes they take. In two laboratory experiments, Leroy found that attention stays on an unfinished task after a switch and lowers performance on the next one (Leroy, 2009). Requiring importance of at least 4 and urgency 5 means a task must matter at least as much as a quarterly goal and grow costly within hours before it interrupts the day, and work that grows costly within days takes a slot in tomorrow’s three.
The table leaves out how long a task takes. Reinertsen’s principle F17 orders work by weighted shortest job first, which divides cost of delay by duration, and I handle the extreme case by hand. A task that takes a few minutes gets done when it arrives, whatever its level, since scoring and listing it would cost more than doing it, a rule close to the two-minute rule in David Allen’s Getting Things Done (2001).
P2 work rarely gets done
Operating-system scheduling explains why the lowest class falls behind. In the multilevel feedback queue described in Operating Systems: Three Easy Pieces, a steady stream of high-priority jobs means long-running jobs “will never receive any CPU time (they starve),” and the book’s fix is a periodic priority boost that moves every job to the top queue (Arpaci-Dusseau and Arpaci-Dusseau, ch. 8). Silberschatz, Galvin, and Gagne call the general remedy aging, which raises a waiting process’s priority as time passes (Operating System Concepts, 10th ed., ch. 5).
A queueing model shows how fast the lowest class falls behind. I treat a person as a single server working one task at a time, with P0 and P1 work as one high-priority class and P2 work as the low class. With random arrivals, exponentially distributed task times, and no preemption, Cobham’s formula gives the mean wait before work in each class starts (Cobham, 1954). The P2 wait is 1/(1 − ρ) times the wait for P0 and P1 work, where ρ is the total load as a share of capacity. At 90% load, P0 and P1 work waits 3.6 mean task times and P2 work waits 36, a factor of 10, and at 95% load the factor is 20 (Figure 2(b), with P2 demand set to 15% of capacity). When total demand exceeds capacity, P0 and P1 work still flows with a mean wait of 1/(1 − ρ1) task times, where ρ1 is their load, and the P2 queue grows without bound.

Figure 2. (a) Schematic value of finishing over time for each quadrant, with no units. Height is importance, and how soon the curve drops is urgency. (b) Mean wait before work starts, in multiples of the mean task time, for one person under strict non-preemptive priority with P2 work at 15% of capacity (Poisson arrivals, exponential task times). A discrete-event simulation of 2 million tasks per load matches the formula to within 1% at 60%, 80%, and 90% total load, within 5% at 95%, and within 1% for P0 and P1 work at 105%. Markers sit at 90% and 95% total load (75% and 80% P0 and P1 load), where P2 work waits 10 and 20 times as long as P0 and P1 work. In the shaded region, total demand exceeds capacity and the P2 list grows without bound.
A person with more worthwhile work than hours has total demand above capacity by definition. As long as P0 and P1 work alone fits in the hours, strict priority keeps it moving while the P2 list grows. In that regime the share of P2 demand that still gets done is (1 − ρ1)/ρ2, where ρ2 is the P2 load. With P2 demand equal to 50% of capacity, one-fifth of the P2 work gets done when P0 and P1 work takes 90% of capacity, and four-fifths when it takes 60%, so how rarely P2 work gets done depends on the slack the higher levels leave. The model has stated limits, since real task times are not exponential, people switch between tasks, and P0 work preempts whatever is in progress. Each of those changes the numbers, and in every case the lowest class still receives only the capacity the higher classes leave.
Bug trackers show long waits at their lowest tiers and a weaker pattern at P2. Among the 85% of 57,966 early Mozilla bug reports that were resolved, half of the P1 and P3 reports were resolved within 30 days and half of the P2 reports within 80 days, while the median for P4 and P5 exceeded 100 days (Mockus, Fielding, and Herbsleb, 2002). The medians leave out unresolved reports, and the middle levels did not follow priority order.
Chromium’s developers report the same pattern in their own tracker. In an FAQ entry in May 2026, they agreed that “many P2s are actually inactive” and wrote that they had “probably overused P2 and under-used P3/P4 labels relative to our stated definitions.” Their published definitions describe P3 as “currently inactive, want to do later” and P4 as “currently inactive, no plans to do” (chromium-dev, May 2026).
Kubernetes automates the outcome for issues outside its top three priority labels. Its backlog label marks work the project agrees is “a nice-to-have, but no one’s available to work on it anytime soon” (Kubernetes issue triage), and its triage bot closes an issue as not planned after 150 days without activity (kubernetes/test-infra). The bot skips issues that are accepted, frozen, or labeled help wanted or good first issue, never closes issues with the three highest priority labels, and lets accepted status lapse after a year without activity.
My own practice with P2 items has two parts. They go on a list that I rarely read, and I plan as if none of them will happen. Each week I review the list, promote the few that have become important or urgent to P1, and delete the rest, a manual version of the periodic boost in the scheduling textbooks that also deletes most items.
Little’s law, L = λW, shows what the review buys (Little, 1961). Here W is the time an item spends on the list until it is done or deleted. In steady state, an illustrative list of 120 items with 3 items a month arriving and the same number leaving holds each new item for W = 120/3 = 40 months on average. A weekly review that keeps the list near 15 items cuts W to 15/3 = 5 months, mostly because deleted items leave sooner, and the kept items get done at the same rate as before.
Each promoted item needs a plan with a date attached. Masicampo and Baumeister found that a specific plan for when, where, and how to do an unfinished task removed the intrusive thoughts it caused (Masicampo and Baumeister, 2011). They tested plans only, so whether deleting an item has the same effect is untested.
AI agents raise the arrival rate of candidate work, because they lower the cost of starting it, while my hours stay fixed. In an earlier post the same queueing model showed that doubling the arrival rate at a code reviewer who was 45% busy raises the mean wait 11-fold. I score agent-proposed work on the same two axes as everything else, and any of it that scores 1 or 2 on importance lands in P2 or drop. An agent connected to prioritykit’s MCP server can apply the same table to its own suggestions, and the server’s instructions tell it to score that work like any other task.
Three goals a day, each traced to quarterly and annual goals
If only P0 and P1 work gets done, the daily plan decides which P1 work gets the hours. Each morning I choose three goals for the day, never more and never fewer, and each one has to trace to a quarterly goal and through it to an annual goal (Figure 3). Email and meetings still happen around them during the day, and the three are the work I protect from both. Three reviews close the loop in Figure 3: each evening I write down what moved on each of the three, each week I check that every quarterly goal got a slot and prune the P2 list, and each quarter I reset the quarterly goals from the annual ones.

Figure 3. An example goal tree with illustrative labels. Each of today’s three goals traces to a quarterly goal and an annual goal, and the writing goal gets its slot on another day. A P0 interrupt rewrites the three, a promoted P2 item waits for a later day’s three, and reviews at three cadences feed back up the tree.
The count is fixed for reasons that come from practice. With three slots, one can go to my family or my health on a day when work could fill every slot. A fixed number removes a decision from each morning, since I never debate how many goals to set. More than three turns the plan back into a to-do list, which is the thing the rule replaces. The trace applies to the three goals only, and reading, play, and side projects done for enjoyment happen outside them and trace to nothing.
The idea is older than my version of it. J.D. Meier’s Getting Results the Agile Way (2010) recommends a “Rule of 3”: “Pick three wins for your day, your week, your month, and your year” (Meier). Leo Babauta recommended three most important tasks (MITs) a day on his blog in 2007 and wrote that at least one of his should relate to one of his goals (Babauta, 2007). My version differs from Babauta’s in two details: every one of the three must trace to a goal, and only a P0 can change them during the day.
The daily three reserve capacity for P1 work before urgent requests claim it, as Google’s site reliability engineering (SRE) teams do with “an advertised goal of keeping operational work (i.e., toil) below 50% of each SRE’s time” (Google SRE book).
Goal-setting research supports parts of the rule, and none of it tests the number three. Locke and Latham, summarizing 35 years of studies, report that “specific, difficult goals consistently led to higher performance than urging people to do their best,” with effect sizes from d = 0.42 to 0.80 (d is the standardized mean difference, Cohen’s d) and a smaller advantage on complex tasks (d = 0.41, against 0.77 on simple ones) (Locke and Latham, 2002). For that reason I write each goal so that I can tell at night whether it happened, such as a 45-minute strength session.
The link from daily goals to quarterly and annual goals has weaker evidence. Höchli, Brügger, and Messner argue in a conceptual paper that abstract, higher-level goals sustain long-term pursuit and work best combined with concrete lower-level goals (Höchli et al., 2018). In their follow-up with 256 people over three months, focusing on both kinds of goal increased effort only relative to focusing on the higher-level goal alone, and adding a higher-level goal to a concrete one, which is what my rule does, made no significant difference (Höchli et al., 2020). The authors call the evidence preliminary.
The daily planning and review routine has better support. Implementation intentions, plans of the form “when X happens, I will do Y,” raised goal attainment with d = 0.65 across 94 tests (Gollwitzer and Sheeran, 2006), which is a reason to give each of the three a time on the calendar. In a diary study of 187 employees over 10 workdays, daily planning of tasks and priorities was associated with higher engagement. The benefit was about half as large on days with many interruptions (a multilevel coefficient of 0.13, against 0.27 on days with few) and not significant on the most interrupted days (Parke et al., 2018). A meta-analysis of 138 randomized studies with 19,951 participants found that monitoring progress raised goal attainment (d = 0.40), with larger effects when progress was physically recorded or reported publicly (Harkin et al., 2016), which is the case for writing the evening check down. Both meta-analyses measure effects against control groups in experiments, so they support the direction of these practices more than any specific size of benefit in a workday.
Energy and the two books behind the system
The first of the two books that shaped this system is Morten Hansen’s Great at Work: How Top Performers Do Less, Work Better, and Achieve More (2018), which gives a chapter to “do less, then obsess,” the practice of choosing a few priorities and putting intense effort into each. Hansen’s study surveyed 5,000 managers and employees, sampled their bosses and direct reports so as not to rely on self-reports alone, and measured performance as a percentile rank against peers (book excerpt). He reports that people who mastered the practice “performed 25 percentage points better than those who didn’t” (Hansen), a difference in percentile rank. The data come from one survey, so the difference is a correlation, and people who already perform well may find it easier to say no.
Jim Loehr and Tony Schwartz’s The Power of Full Engagement (2003) adds a constraint that an hours budget misses. They describe physical, emotional, mental, and spiritual energy and argue for alternating periods of full effort with deliberate recovery, drawing on their coaching of athletes and executives. Their evidence is case studies from that coaching, without controlled trials. The book is the reason a slot can go to exercise, which a plan built on hours alone would score as unproductive.
Where the system fails
Priority levels drift when nothing limits them. Chromium’s May 2026 post announced that every P1 bug created before 2026 would move to P2 “to better align with our stated priority definitions and SLOs,” and published its longstanding service-level objectives (SLOs), under which a P0 is fixed within a week and a P1 closed within four weeks (chromium-dev, May 2026). In my system, raising a task to P0 means rewriting the day’s three and naming what it displaces, which puts the cost in front of me when I make the choice.
A fixed count of three invites easy goals. Ordóñez and colleagues list side effects of goal setting, including narrow focus and inhibited learning (Ordóñez et al., 2009), and Locke and Latham replied that the critics had misread the evidence (Locke and Latham, 2009). The trace to a quarterly goal blocks goals that move nothing, and nothing in the system blocks a goal that is too easy, so the weekly review is where I check that each quarterly goal is moving.
Some work scores low on both axes until it fails. Preventive maintenance, a medical checkup, and a pile of small fixes can each sit at low urgency for months, and the Quadrant II curve in Figure 2(a) shows how that ends. I rate such work by the harm it prevents, which the importance anchor at 5 allows. At the weekly review I also score a pile of small items of one kind, such as small fixes, as one item, since together they can reach P1 when none does alone.
A P2 task can also block a P1 task, such as a small configuration fix that a quarterly deliverable depends on. When it does, it inherits the importance of the work it unblocks, and I rescore it. The table has no column for dependencies, so this check happens by hand.
Three goals still fail when each one is too large. In the first study by Buehler, Griffin, and Ross, students predicted they would finish their honors theses in 33.9 days on average, took 55.5 days, and only 29.7% finished by their own best guess (Buehler et al., 1994). Those were multi-week student projects, so the size of the error does not transfer to a single day, and the direction is still a reason to leave margin, since a goal sized for a full day leaves no room for P0 work.
The system assumes I set my own priorities. At work a manager, a customer, or an on-call rotation often sets importance and urgency, and someone early in a career has less room to decline a request. In that setting the scores are most useful for showing what a new request would displace.
The scores themselves remain judgments. Cox showed that ordinal risk matrices can give identical ratings to very different risks and can rank a smaller risk above a larger one (Cox, 2008), and my 1-to-5 scores share that weakness. Two people can rate the same task differently, and so can one person who is tired.
Summary
I map 1-to-5 importance and urgency scores with an importance-first table in which 2 of the 25 cells are P0, 10 are P1, 7 are P2, and 6 are drop. Importance sets the level because the mere urgency effect inflates the weight people give urgency, and a replication with 2,374 participants found that effect smaller but still significant. In a single-server priority queue, P2 work waits 10 times as long as P0 and P1 work at 90% load and 20 times as long at 95%, and in overload the share of P2 work done falls to the slack the higher levels leave, one-fifth at 90% P0 and P1 load. The Mozilla and Kubernetes records cited above have the same long waits at their lowest tiers. Each day I pick three goals that trace to quarterly and annual goals, supported by d = 0.65 for if-then plans across 94 tests and d = 0.40 for monitoring progress across 138 randomized studies, while the number three itself rests on my experience.
This is an independent analysis I did on my own time, using the public sources cited above. The views are my own and do not represent any current or former employer.
Frequently asked questions
How do P0, P1, and P2 map onto the Eisenhower matrix?
I rate importance and urgency from 1 to 5. A task with importance of 4 or more and urgency 5 is P0 and interrupts the day. Any other task with importance of 4 or more is P1, and so is importance 3 with urgency of 4 or more. The rest of the importance-3 row is P2, and so is low-importance work with urgency of 4 or 5. Everything else is dropped. Of the 25 cells, 2 are P0, 10 are P1, 7 are P2, and 6 are drop.
Why does P2 work rarely get done?
Under strict priority, the lowest class gets only the capacity the higher classes leave. In a single-server queue model with two priority classes, P2 work waits 1/(1 − ρ) times as long as P0 and P1 work, where ρ is the total load, so 10 times as long at 90% load and 20 times as long at 95%. When total demand exceeds capacity, P0 and P1 work still flows as long as it fits in the hours, the P2 queue grows without bound, and the share of P2 demand that gets done falls to the leftover capacity divided by the P2 demand. Bug trackers show long waits at their lowest tiers. Among resolved reports in early Mozilla data, the median P4 and P5 report took more than 100 days, and Kubernetes closes inactive issues after 150 days unless they are accepted, frozen, labeled help wanted or good first issue, or carry one of its three highest priority labels.
Is the rule of three daily goals backed by research?
Research supports the practices around the rule: specific, difficult goals lead to higher performance than do-your-best goals, if-then plans raised goal attainment with d = 0.65 across 94 tests, and monitoring progress raised it with d = 0.40 across 138 randomized studies. No study has tested the count. I use three because it leaves room for goals beyond work, removes a daily decision about the count, and keeps the plan from turning into a to-do list. J.D. Meier and Leo Babauta described similar rules of three earlier.
Is there a tool that implements this prioritization system?
prioritykit, an open-source Python package on GitHub (github.com/jman4162/prioritykit) and the Python Package Index (pip install "prioritykit[mcp]"), applies the same 5 x 5 table, the daily-three check with goal tracing, and the weekly P2 review. It runs from the command line and through a Model Context Protocol (MCP) server that AI agents can call, and it reads goals, today's plan, and the P2 list from a plain TOML file.
Is "Do Less, Then Obsess" a book?
Do less, then obsess is the subject of a chapter in Morten Hansen's book Great at Work: How Top Performers Do Less, Work Better, and Achieve More (Simon & Schuster, 2018). Hansen surveyed 5,000 managers and employees and reports that people who mastered the practice performed 25 percentage points better, in percentile rank against peers, than those who did not. The data come from one survey, so the difference is a correlation.